Skip to content
How it works

Simple and clear, from enquiry to collection

We take care of transport, placement and collection. Your team connects the bar using the manual provided, and looks after the service. Drinks you arrange yourself or have us supply on request.

  1. 1

    Discuss your event

    Based on the location, the type of event and the capacity you need, we decide together which bar container suits you best.

    You tell us when and where the event is and how many visitors you expect. We advise the 10 ft or the 20 ft, think along about the layout on site and send you a tailored quote.

  2. 2

    Transport and placement

    Our haulier delivers the bar container and sets it down on the spot you point out.

    The container arrives on a truck with a crane. You choose the spot on site; make sure it is level, firm and easy to reach. Apart from that, you do not need to arrange anything for the transport.

  3. 3

    Connect it yourself with the manual

    Your team connects the bar to power, beer, CO2 and water if needed. With the manual we supply, that takes a quarter of an hour.

    The connections for beer, CO2 and water sit on one connection panel on the outside, which we call the herder, and they are numbered: beer 1 to 4, CO2 1 to 4 and water. Power has its own socket. The introduction manual and the stickers in the container show step by step how it works, right down to the correct tap pressure. Questions on site? Just give us a call.

  4. 4

    Collection afterwards

    After the event we collect the container again. The site is left clean.

    You leave the bar tidy following the short checklist, and we take care of the rest. Longer hire periods, for example a whole season, are also possible.

What you arrange

What is needed on site

Five things we go through with you when you enquire, so the placement goes without surprises.

The connection panel with numbered connections for CO2 and beer 1 to 4, water and drain
  • A level, firm and accessible spot

    The container is placed by a lorry with a crane. The loading and unloading area must be easy to reach and drive on.

  • Power: 220V or 380V

    The 10 ft needs 1,240 W, the 20 ft 2,300 W. The power cable is in the storage box.

  • Water supply

    For the sinks and the cooling bath of the beer cooler. A drain is convenient, but not required.

  • Beer kegs and CO2

    You arrange these yourself, or have us supply the drinks on request. The kegs stand outside the container, the CO2 has a fixed bracket inside.

  • Bar team

    We supply the bar, you supply the staff. No team of your own? On request we help you arrange staff. With the introduction manual, everyone knows their way around within a few minutes.

Afterwards

Leave it tidy, we do the rest

You leave the bar clean, drain the cooling bath of the beer cooler and put the cables and hoses back in the storage boxes. A short checklist in the container helps you with this. We then collect the container.

Two BCV storage boxes under the sink, with the power cable, beer lines and water hose neatly stored

Need a bar container for your event?

Send us the date, the location and the number of guests you expect. You will receive a no-obligation quote within one working day.